Product Details:
|
|
Place of Origin: | china |
---|---|
Brand Name: | alphaclean |
Certification: | ce |
Model Number: | ISO clean room |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 set |
Price: | negotiation |
Packaging Details: | Polywood packing |
Delivery Time: | 20 days |
Payment Terms: | L/C, T/T, Western Union |
Detail Information |
|||
Clean Room Level: | ISO 5 - 8 | Standards: | ISO 14644-1 CLEAN ROOM FS209E |
---|---|---|---|
Application: | Pharma,electronics,lab ,food, Hospital | Scope: | Struture , HVAC , Electricity / Monitoring |
Period: | 1 - 4 Months | Service: | Field Installation , Commissioning And Training,engineer Are Able To Service Machinery Overseas |
Warranty: | 1 Year | Document: | Verification And Certification |
Name: | ISO 8 Class 100000 Clean Room | ||
High Light: | ISO 8 Class 100000 Clean Room,Dust Free ISO 8 Clean Room,Lab ISO Clean Rooms |
Product Description
Dust Free ISO 8 Class 100000 Clean Room Projects
The dust-free workshop project is mainly composed of the following systems: air filtration system, environmental monitoring system, fire alarm system, people flow system, process piping system, power system, lighting system, maintenance structure and electrostatic ground treatment systems. The air-conditioning purification system project includes the entire equipment, equipment matching and construction installation.
The 100,000-class dust-free workshop standard is based on "the number of dust particles with a diameter greater than or equal to 0.5um per cubic meter of air" as a measure of its cleanliness. "Class 100,000 dust-free workshop" means that the number of dust particles with a diameter greater than or equal to 0.5um in each cubic of air is less than 100,000.
we offer cleanrooms compliant with FS209E levels 100 - 100,000 and ISO 14644 levels 5 - 8. Our services range from consultation, design, manufacture, installation, and any combination thereof. We also offer cleanroom equipment and accessories.
What We Can Do For You ?
Front end consultancy support, Concept design and engineering.
Clean room design and construction.
Unique range of clean room modular walls and ceilings, flooring system.
Cleanroom accessories (pass boxes, step over benches, change room furniture and fittings, sampling and dispensing booths, air showers, etc.) GRP clean room doors.
Equipment selection ,Validation master plans, protocols and continuous monitoring systems regulatory advise.
HVAC Design and Installation.
Function of clean room
The main function of clean room is to control the cleanliness and temperature & humidity of the atmosphere that products (such as silicon) contact, can make the products in a good environment of production and manufacturing, this space we call it clean room. According to international practice, dust-free purification level mainly be decided according to the number of air particle diameter per cubic meter is greater than the standard number of particles. That is the so-called no dust, is not 100% no dust, but control on a very tiny amounts of units. Of course accord with standard of dust particles in the standard relative to our common dust is very small, but for optical structure, even just a bit of dust will have a very negative impact, so on the optical structure of production, no dust is the inevitable requirement.
Enter Your Message