Product Details:
|
|
Place of Origin: | china |
---|---|
Brand Name: | alphaclean |
Certification: | ce |
Model Number: | ISO clean room |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 set |
Price: | negotiation |
Packaging Details: | Polywood packing |
Delivery Time: | 20 days |
Payment Terms: | L/C, T/T, Western Union |
Detail Information |
|||
Clean Room Level: | ISO 5 - 8 | A/C System: | Purified Air Handling Unit, Water Chillers.etc |
---|---|---|---|
Application: | Pharma,electronics,lab ,food, Hospital | Construction: | Ceiling,partition,door And Window Design And Installation |
Leading Period: | 1 - 4 Months | Services: | Field Installation , Commissioning And Training,engineer Are Able To Service Machinery Overseas |
Warranty: | 1 Year | Frame Material: | SUS 304/ Powder Coated Steel/ Aluminum Profile |
Test: | Clealiness Level Test After Clean Room Project Finish | Place Of Origin: | Shenzhen ,china |
High Light: | Hardwall ISO Clean Rooms,Dustproof ISO Clean Rooms,SUS304 Frame Pharmacy Clean Rooms |
Product Description
Class 100 Purified Air Handling Hardwall ISO Clean Rooms SUS304 Frame
ISO 5 Class 100 Dust-Free Clean Room Workshop
The Class level 100 clean room dust-free workshop standard is based on "the number of dust particles with a diameter greater than or equal to 0.5um per cubic meter of air" as a measure of the cleanliness of the device. " Class 100 dust-free workshop" means that the number of dust particles with a diameter greater than or equal to 0.5um in each cubic of air is less than 100.
The main function of the 100-class clean room is to control the cleanliness, temperature and humidity of the atmosphere that the product is connected to, so that the product can be produced and manufactured in a good environment.
The dust-free workshop project is mainly composed of the following systems:
air filtration system, environmental monitoring system, fire alarm system, people flow system, process piping system, power system, lighting system, maintenance structure and electrostatic ground treatment systems. The air-conditioning purification system project includes the entire equipment, equipment matching and construction installation.
Enter Your Message